Front of the home under construction, with structure and window frames in place
  • Type4-bedroom house
  • LocationTorres Vedras
  • ScopeFull construction

From foundations to handover. This home was built by ErgoConstroi and followed by our crew at every stage, from the foundation trenches to the final finishes.

Every photograph on this page is real and was taken during the build.

1

Site setup and excavation

Setting up the site and excavating the ground for the basement and foundations.

Excavation begins
Excavation begins
Ground excavated, ready for the foundations
Ground excavated, ready for the foundations
2

Retaining walls and drainage

Reinforced concrete walls to hold back the ground, with a drainage membrane on the outside.

Retaining wall rebar
Retaining wall rebar
Retaining wall poured
Retaining wall poured
Drainage membrane along the wall
Drainage membrane along the wall
Rebar over drainage membrane, concrete cover checked
Rebar over drainage membrane, concrete cover checked
3

Foundations and structure

Reinforced concrete foundations, columns and slabs, built and checked carefully before moving on.

Pouring the foundations with a concrete pump
Pouring the foundations with a concrete pump
Reinforced concrete walls and ground slab mesh
Reinforced concrete walls and ground slab mesh
Slab rebar before pouring
Slab rebar before pouring
Structure with slab shoring
Structure with slab shoring
4

Reinforced concrete stairs

Formwork, rebar and concrete for the interior stairs, all built on site.

Stair rebar before pouring
Stair rebar before pouring
Formwork for the steps
Formwork for the steps
Poured stairs, ready for cladding
Poured stairs, ready for cladding
5

Roof, facade and waterproofing

External thermal insulation of the roof and facade, and waterproofing of balconies and terraces.

Roof thermal insulation
Roof thermal insulation
External facade insulation
External facade insulation
Balcony waterproofing
Balcony waterproofing
Reinforcement mesh on the terrace
Reinforcement mesh on the terrace
6

Building services

Water, heating/cooling and mechanical ventilation (MVHR) installed before walls and ceilings are closed.

Water and heating pipework
Water and heating pipework
Ventilation ducts in the ceiling
Ventilation ducts in the ceiling
Ventilation distribution boxes
Ventilation distribution boxes
Water manifold box
Water manifold box
7

Floors

Lightweight fill, insulation, reinforcement mesh and a levelled screed ready for the final floor.

Expanded clay fill
Expanded clay fill
Insulation and mesh before the screed
Insulation and mesh before the screed
Laser-levelled screed
Laser-levelled screed
8

Finishes

Tiling, joinery, kitchen, sanitaryware and lighting, with mid/high-range materials.

Fitted kitchen
Fitted kitchen
Marble bathroom
Marble bathroom
Cantilevered staircase
Cantilevered staircase
Built-in wardrobes
Built-in wardrobes
9

Finished home

The finished home, with photovoltaic balcony railings, ready to live in.

Finished facade with photovoltaic railings
Finished facade with photovoltaic railings
Open-plan living room and kitchen
Open-plan living room and kitchen

Before and after

The same corridor, photographed from the same spot: bare brick and rubble, and then finished. Drag the bar to compare.

The same corridor finished, white walls, laminate floor and ceiling spotlights Corridor under construction, brick walls and rubble on the floor In progressFinished

Real photographs of this build.